About Us
Our Services
Recent Projects
Industry News
Contact Us

Pre-purchase Building Inspection

Pre-purchase and pre-lease inspections can significantly reduce risk in the purchase or lease of a commercial building where there will be little or no recourse for the buyer or lessee.

Building Inspections are one of TiCon’s services to it’s customers. The following is an overview of available inspections.

Basic Inspection. The Basic Inspection protocol is intended to document those defects which are likely to be significant liabilities for the buyer. It is not intended to record small defects common to buildings of the age and type as that being inspected. Photos are included.

Title

Report

Bldg.1

DESCRIPTION OF BUILDING report includes: type of construction, clear interior height floor-to-floor/roof, column spacing and bay sizes, interior wall types, notation of HVAC units/systems, electrical service size, number of restrooms, sprinkler system, percent of interior area built out.

Bldg.2

ROOF INSPECTION includes notation of roof hatches, equipment screens, roof structures, deck camber, construction type, flashing, detailing, debris and potential for debris accumulation, ponding, roof drains, overflow drains, AC units, skylights, roofing materials, other equipment and features.

Bldg.3

SURVEY OF INTERIOR DEFICIENCIES include inspection for general condition of walls, doors, windows, ceiling and registers, general condition of floors/slabs, examine switches and lighting for compliance with energy conservation laws, note restroom and fixture conditions, visible structural supports and beams, interior circulation, presence of sprinklers and evidence of non-permitted work.

Bldg.4

SURVEY OF EXTERIOR DEFICIENCIES includes notation of foundation and wall cracks and subsidence, entry door condition and operation, window condition and operation, soffit and venting, roof water drainage control, railings and stairways..

Bldg.5

MEANS OF EGRESS includes occupancy load calculations, number and separation of exits based on building area, type and occupancy, along with a survey of requirements for fire rated egress path of travel. Notation of compromised exiting systems

Bldg.6

SURVEY OF SITE includes landscape condition, irrigation, curbs and fences; vehicle and pedestrian approaches, curbs and gutters, paving condition, parking bumpers, drainage, catch basins, exterior lighting, trash enclosure; notation of transformers, electrical service, gas manifold, standpipes, fire sprinkler post indicator valve, monitoring, back flow preventer, local hydrant and signs.

Bldg.7

TITLE 24 HANDICAPPED ACCESS SURVEY is an extensive code compliance review of single and multiple restroom layouts and features, shower stall, drinking fountain, telephone, interior and exterior access and ramps, entrances and exits, stairway and elevator, circulation paths and clearances, parking review and required handicapped signage.

 

Bldg.1 through Bldg.7 estimate of cost** based on $105.00/hourly

Use

Area in S.F.

Estimated cost

Office, Mfg. Mixed

Under 10,000 s.f.

$975.00 - 1,275.00

10,000 to 50,000 s.f.

$1,550.00 - $2,450.00

 

 

 

** Cost may increase if original building and site drawings are unavailable.

Cost estimates for repairs and/or replacement of defective items can be done at extra cost.

 

Supplemental Reports by licensed experts in a variety of fields are also available where desired or indicated in the basic report. Prices shown are estimates based on historical costs - actual pricing may vary slightly due to time constraints and other variables. Pricing includes a fee of 15% for subcontract administration. Additional inspection/project management hours may also accrue.

Title

Supplemental Report

Estimated cost

Bldg.1.1

Roof report by a licensed roofing contractor which will include an estimate for repair or replacement of the roof. Usually free of charge

None

Bldg.8

Suite survey: (Optional) suite by suite survey of obvious defects in finishes

105.00 hourly

AC.1

Air conditioning package unit basic survey 1-1/2 to 15 tons - price per unit

$75.00 per unit

AC1.1

Air conditioning package unit operational report 1-1/2 to 15 tons- price per unit

$140.00 per unit

AC.2

Air conditioning package unit basic survey 16 to 70 tons - price per unit

$150.00 per unit

AC.2.1

Air conditioning package unit operational report 16 to 70 tons- price per unit

$205.00 per unit

Struct.1

Structural engineer’s report of any failures discovered in building

$165.00 hourly

Elev.1

Elevator inspection - per unit

$680.00 each

Elec.2

Electrical systems inspection

$95.00 hourly

Fire.1

Fire protection inspection - Riser inspection for current certification, monitoring, outstanding deficiencies, occupancy rating (if design criteria available) - cost per riser (generally one riser)

$460.00 per riser

Fire.2

Ansul System Inspection - Restaurant hood

101.00 per hour

Plmb.1

Plumbing Inspection- service and waste sizing

$125.00 hourly

Plmb.2

Video camera inspection of waste line, 2 hour minimum (200'-300' feet of line)

$205.00 hourly/min

Allow a minimum of 10 business days for the inspection; more if there is a requirement for cost estimates or supplemental reports

TiCon - You get it on time or you get my car keys - Sam Burkhouse

We Never Charge For Quotations From Your Plans And Specs
Pre-Construction Services Available

 

info@ticon.com