Code and Legal Topics
September 2007

Permit Submittal List

Clients are frequently stunned by Architects' proposals to prepare the construction documents for their interior improvements. The design professional is responsible not only for programming their client's requirements and artfully implementing them within the space but also for the preparation of the construction documentation in a manner that fulfills the requirements of the jurisdiction's Building and Planning departments.

The following list (somewhat abbreviated) is compiled from the City of San Jose's Handout No. 2-10 titled "Suggested Document Submittal List – Tenant Improvements". This list is, more or less, the archetype for bay area cities and illustrates the scope of the information that cities require in order to issue a building permit and associated trade permits.

City of San Jose

Suggested Document Submittal List – Tenant Improvements

Sheet

 

Highlighted sheet numbers and titles are derived from common examples

A - 1

General Information Sheet

 

 

 

 

Name, Title, Address, Phone No. of Design Professional

 

 

Project Name & Address, as well as Project Owner’s Name, Address & Phone

 

 

Applicable Codes and Editions (UBC,UPC,UMC,NEC,UCBC & Energy)

 

 

Description of Scope of Work

 

 

Occupancy Group(s) and Type of Construction

 

 

Index of Drawings

 

 

Legend of Proposed Construction Plan

A - 2

Plot Plan (Site Plan)

 

 

 

 

Lot Dimension Showing Whole Parcel, Property Lines and Street

 

 

Building Footprint with all Projections and Dimensions to Property Lines

 

 

Vicinity Location Map and North Arrow

 

 

Parking Layout, (Fully Detail all Disabled Accessibility Features)

 

 

Detail Exit Door Locations

A - 3

 Key Plan

 

 

 

 

Location within Building Where work is Being Done

 

 

Path of Travel from Space to Exterior Exits  (EXIT PLAN)

 

 

State Disabled Access Path of Travel to Main Entrance

A - 4

 Architectural and Structural Plans

 

 

 

Roof Framing Plan - where new roof equipment is to be installed

 

 

Architectural Floor Plans and Seating Plan within Assembly Use Areas

 

 

Exit Location(s), Path(s), and Lighting

 

 

Exterior Elevations (when Changes to Existing are made)

 

 

Structural Material Specifications

 

 

Structural and Architectural Details

 

 

Reflected Ceiling Plans with Bracing & Support Details

 

 

Provide Details of All Features and Fixtures in Compliance with the State Building Code Disabled Accessibility Standards (Chapter 11 or 11A)

A - 5

  Additional details (where applicable)

 

 

Window Schedule: List Sizes and Types (Detail Safety Glazing Locations)

 

 

Door Schedule: Sizes and Types ( Fire Ratings, Hardware) 

 

 

Handrails, Guardrails, and Support Details

 

 

Structural Sections with Details at Foundation, Floor and Roof Levels

 

 

Detail of Fire Separations with Assembly Numbers and Sections 

 

 

Detail all Fire Penetrations & Openings includes Assembly Numbers  

 

 

Cross Section of Fire Rated Corridor, Smoke/Fire Damper Locations 

 

 

Finish Schedule with Flame Spread Ratings

 P - 1

  Plumbing Plan  - 3rd party engineered or by GC's subcontractor

 

 

 

Plumbing Fixture and Single Line Schematics (Isometric Diagram may be required for complex Plumbing Plans) with Pipe Size Calculations

 

 

 

 

Chemical Waste & Piping Plan (Will need Water Pollution Control & Hazmat Approval) 

 

 

 M - 1

  Mechanical Plan    - 3rd party engineered or by GC's subcontractor

 

 

HVAC Plans (Location, Size Duct Layout, and Smoke/Fire Dampers)  

 

 

Roof/Wall Penetration Details and Specifications 

 

 

 

Gas Piping and Sizing Calculations

K - 1

Kitchen Plan

 

 

 

 

Kitchen Plan for Commercial Kitchens and Santa Clara County Health Department Approval which must be obtained PRIOR to city submittal

 

 

E - 1

Electrical Plan   - 3rd party engineered or by GC's subcontractor 

 

 

Outlets, Fixtures, Switches, Service Panels, Subpanels

 

 

Electrical Ceiling Lighting Plan (Including Exit Lighting as Applicable)

 

 

Wire and Conduit Sizes on Electrical One Line Drawing

S-1

Structural plan

 

 

Details and calculations for any alteration of structural components of the building

T - 24

Title 24 Energy Compliance

 

 

 

 

Form ENV-1, MECH-1, LTG-1 and LTG-2 ALL Required Signatures on Documentation - Complete Calculations Based on Scope of Work

 

 

List of Mandatory Features, Complete ENV-1,MECH-1,LTG-1,LTG-2 on Drawings  

 

 

 

 

 

SEPARATE PERMIT DESIGN SUBMITTALS

 

 

In addition to the building permit the following permits (where applicable) must be applied for separately

 

 

 

1

Storage Racks with Storage Level Over 8’ High Require Permits. Provide Calculations and Details

 

 

 

2

High Piled Storage Areas (commodities as regulated by the Fire Code)

 

3

Fire Alarm/Smoke Detection System

 

4

Flammable Liquid Storage Areas, Compressed Gases

 

5

Spray Booths

 

6

Automatic Fire Sprinklers/Extinguishing Systems -by GC's subcontractor

"Hot Spots"

Structural Engineering Required

 

New AC or other equipment loads on the roof exceeding 400 lbs.

 

Floor mounted equipment - bearing and seismic restraint calculations over 400 lbs.

 

Any opening in a structural wall or other building component

Health Department Approval

 

Any food service operation. Health Department must sign off on plans prior to submittal to the city. This will add about 30 days to plan check duration. Break rooms having only refrigerator and microwave do not need HD approval.

Planning Approval

 

Any modification to the exterior of a commercial building requires planng department approval. Depending on substance of changes this can delay project by hours or months.

   
   